Where the paperwork goes
A Tallahassee replacement is filed with the state, and there is no county fee on top
Most Florida septic replacement advice tells the homeowner that the county health department sets the permit fee. For Leon County that is not how it works. FDEP's permitting FAQ puts Leon County in the group of counties where DEP issues the permit directly, effective with Phase 1 of the transition on January 2, 2025. The package is the Application Form on page 1 of DEP 4015, the Site Plan on page 2, and the building's floor plan, filed through DEP's online permit and service request portal or mailed to 2600 Blair Stone Road, MS #3599, Tallahassee, FL 32399-2400. Source: FDEP - Onsite Sewage FAQ, Permitting
The fee consequence is the useful part. FDEP explicitly tells applicants in the fifty health-department counties that the county "will also determine the total permitting fee (including any county fees)." In Leon County there is no such county determination and no county fee schedule stacked on the state fee - the amount is whatever Rule 62-6.030, F.A.C. sets. That rule's current version took effect June 8, 2026, with prior amendments on July 9, 2025 and earlier, and it was formerly numbered 64E-6.030. The current DEP 4015 form carries the same June 8, 2026 revision date.
This page does not print the dollar figures from that rule. They exist and they are public, but the adopted fee table is not reachable in a readable page on FDEP's site or the Florida Administrative Code gateway from here, and a number copied from a contractor blog or a superseded version of the rule would be worse than an honest blank. Get the current amount from DEP through the permit portal or at OSTDS_Feedback@FloridaDEP.gov, and treat any Tallahassee quote that states a confident county permit fee as something to verify rather than trust.
One sequencing rule is worth more than the fee to a homeowner in a hurry. The site evaluation is page 3 of the form, DH 4015, and FDEP allows the applicant to either have DEP perform it or hire a qualified private site evaluator - but states that a private evaluation must be completed before the application is submitted and uploaded as part of that application. A replacement filed without it is a replacement that waits.